A year ago this week we shipped Handoff 2.0. It removed four commands and a dashboard, and left one command in their place. It was the release we argued about longest, and the one we would repeat first.
What we took away
Before 2.0 a deploy was build, check, upload, promote and then a button in a dashboard. We had written each step for a good reason. Together they were a procedure people had to remember.
When we looked at how teams used them, nine in ten ran the five steps in the same order every time, usually from a script they had written to save themselves the typing.
$ handoff deploy
✓ Built, checked and live in every region
We removed four commands. What was left was the thing people were already doing.
What a year showed
Teams deploy more often when a deploy is one step. The median project went from four deploys a week to eleven, and the share of deploys that were rolled back fell by half, because each one carried less.
What we got wrong
We removed the dashboard button before the command line could do everything the button did. For six weeks there was no way to hold a deploy for approval. We should have shipped handoff deploy --hold first.
The rule we took from it: nothing leaves until its replacement has been in use for a full release. Every release since has kept to it, and none has needed a migration.
Mateo Lindgren